Batteries comparison for an optimal accumulation performance on PV isolated systems
DOI:
https://doi.org/10.24084/repqj10.549Keywords:
Batteries performance, battery discharge, quality controlAbstract
The Pierre Auger Project is a macro-grid of 1600 PV identical systems installed on Argentina. Each of this PV is fully monitored. All the data are sent to a central building and recorded for data analysis. In this paper performance of batteries from different manufacturers is studied and compared, trying to find the optimal solution for this experiment, taking in account climate and operation conditions.