Positive effects of the migration from Ka-band satellite to 4G solution for the communication needs of a scattered set of 1 MW solar farms in Poland: A user’s experience

Authors

  • Enrique Tébar PhD Author
  • Luis Hurtado Author
  • Witold Bąk Author
  • Zbigniew Kulesza M.Sc. Eng Author
  • Andrzej Napieralski Prof Author

DOI:

https://doi.org/10.24084/repqj19.212

Keywords:

Solar photovoltaics in Poland, scattered generation; video-analytics, 4G migration, CCTV monitoring, Ka-band; lag time

Abstract

This paper contains a concise overview of the deployment of scattered solar power plants across Poland, mainly from the perspective of their communication networks, and how the recent development of the Polish 4G networks has a very positive impact for the performance of the whole monitoring system (production control and video-surveillance), with a special emphasis on video-analytics, due to its higher bandwidth demand. All the information will be shown from the point of view of the solar photovoltaics developer I+D Energías, and therefore it constitutes a real user’s experience.

Author Biographies

  • Enrique Tébar PhD

    University of Alicante. Spain

  • Luis Hurtado

    Vodafone Spain, Madrid. Spain

  • Witold Bąk

    Department of Microelectronics and Computer Science, Lodz University of

        Technology. Poland

  • Zbigniew Kulesza M.Sc. Eng

    Department of Microelectronics and Computer Science, Lodz University of

    Technology. Poland

  • Andrzej Napieralski Prof

    Department of Microelectronics and Computer Science, Lodz University of Technology, Poland

Downloads

Published

2023-12-28

Issue

Section

Articles