Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
DOI:
https://doi.org/10.24084/repqj08.700Abstract
Deregulation and liberalization of electric power
industry, among other things, has created new requirements for
the market participants. The power system engineer, operator,
and, in general, the market participant is being faced with
requirements for which he does not have adequate training and
the proper software tools. In this framework, among others, a
pure hydro-generation company has to operate its hydro units,
throughout the operating day, trying to fulfill the market
clearing schedule or a bilateral contract, and modify the
program in the intra-day energy markets if necessary (or more
suitable) as real-time operation is getting closer. In this
scenario the objective is to maximize the hydroelectric power
plant profit from selling energy in the spot market or by means
of bilateral contracts. In this paper the optimal operation of a
head-dependent hydroelectric power station in bilateral
market−short-term hourly hydro resource scheduling for
energy− is obtained.