Real Problems in Utility High Voltage Network due to Grid Connected Photovoltaic Power Generation. The experience of Endesa.

Authors

  • Javier de la Cruz Author
  • Pedro Gómez Author

DOI:

https://doi.org/10.24084/repqj08.375

Abstract

Photovoltaic (PV) systems require connection to a

utility power grid to work effectively as energy sources.

Numerous problems and unusual configurations have been

detected in those connections: Some problems are due to a

dysfunction of the faulted-phase relay protection on Substations

(Sub.) not originated in all cases by phase imbalance of the PV

inverters, other problems are related to an abnormal stationary

(resonant) state of generation just after islanding of the plant,

where frequency and amplitude of the power signal are in a

corrupted stable state caused by the inverters. The final problem

to be discussed is related to switch-on sequencing and

associated starting inverter’s problems.

Author Biographies

  • Javier de la Cruz

    Endesa Distribución Eléctrica S.L.U.

    Escudo del Carmen 31, 18009-Granada, España

    franciscojavier.delacruz@endesa.es

  • Pedro Gómez

    Grupo de Investigación IDEA,

    Escuela Politécnica Superior, Universidad de Jaén,

    Campus de las Lagunillas 23071 - Jaén, España

    pvidal@ujaen.es

Published

2024-01-24

Issue

Section

Articles