Condition Assessment of Oil Transformer Insulating System

Authors

  • P. Prosr Author
  • M. Brandt Author
  • V. Mentlík Author
  • J. Michalík Author

DOI:

https://doi.org/10.24084/repqj08.296

Abstract

Reliable operation of transformers largely depends on a lifetime of insulating system. For this reason the paper deals with a description of our experience with developed monitoring system, which is focused mainly on a control of oil filling of experimental transformer. Relative humidity, amount of dissolved gases and increased temperature are observed, as they have decisive influence on insulating system of transformer. Monitoring of these characteristics is completed with analysis of oil samples by infrared spectroscopy in mode of Attenuated Total Reflection technique.

Author Biographies

  • P. Prosr

    1 University of West Bohemia,

    Faculty of Electrical Engineering, Department of Technologies and Measurement,

    Univerzitní 26, 306 14 Pilsen (Czech Republic)

    Phone/Fax number: +420 377 634 519/ +420 377 634 502, e-mail: prosr@ket.zcu.cz

  • M. Brandt

    University of Žilina

    Faculty of Electrical Engineering, Department of Measurement and Applied Electrical Engineering

    Univerzitná 1, 010 26 Žilina, Slovakia

    Phone/Fax number: +421 41 513 5063/+421 41 513 1529

    brandt@fel.uniza.sk

  • V. Mentlík

    1 University of West Bohemia,

    Faculty of Electrical Engineering, Department of Technologies and Measurement,

    Univerzitní 26, 306 14 Pilsen (Czech Republic)

    Phone/Fax number: +420 377 634 519/ +420 377 634 502,

  • J. Michalík

    Research Centre of Mechatronics Systems

    EVPÚ a.s. Nová Dubnica and Faculty of Electrical Engineering ŽU in Žilina

    Univerzitná 1, 010 26 Žilina (Slovakia)

    Phone/Fax number: +421 41 513 5063/+421 41 513 1529, e-mail: michalik@fel.uniza.sk

Downloads

Published

2024-01-24

Issue

Section

Articles