Short-circuits simulation at 25 kV,50 Hz contact line system
DOI:
https://doi.org/10.24084/repqj05.322Keywords:
Filter-Compensation Equipment, Supply Substation, Harmonics, Transient Effect, Short-Circuit, Contact LineAbstract
The paper deals with the problem of behaviour of 25 kV, 50 Hz supply system at Czech Railways. Traction supply system is represented by contractor supply line 110 kV, supply substation and contact line. The main problem is short-circuits at contact lines. These effects can arise during failure states of traction circuit. It is necessary to know exact behaviour of traction circuit for adjusting of operation protections.